Direct answer

A useful whole-home storage inventory should state what is stored, how often it is used, where it enters or leaves the home, its approximate volume and dimensions, who needs access, and whether the need is fixed or likely to change. It then converts those findings into room-by-room capacity, access and flexibility requirements before joinery is designed. This avoids filling every spare wall with cupboards that are deep but awkward, or creating beautifully aligned doors that conceal the wrong internal arrangement. The inventory is a design input rather than a shopping list: it connects routines, possessions and maintenance with the architecture and gives the designer a testable brief.

    Map routines before measuring cupboards

    Begin with movement through the day. Note where bags, shoes, keys and deliveries arrive; where serving pieces are used; where linen is changed; and where cleaning equipment can be taken out without crossing a formal room. A storage location is useful when it supports the activity rather than merely occupying nearby wall space. Separate items used daily, weekly, seasonally and rarely. Daily items need comfortable reach and a quick return path. Rare items can sit higher or deeper, provided access is planned. RIBA’s Plan of Work emphasises defining outcomes and information exchanges at the right stage, while its Plan for Use guidance reinforces measurable user outcomes and feedback. For storage, the equivalent is a brief that can be checked after move-in.

    • Arrival and departure
    • Food preparation and serving
    • Laundry and linen
    • Cleaning and maintenance
    • Work, study and hobbies
    • Guest and seasonal use

      Build categories that translate into dimensions

      Photographing every possession can become laborious without improving the design. Instead, group items by the physical condition that matters: hanging length, folded stack, drawer height, shelf span, ventilation, security or charging. Measure outliers such as suitcases, sports equipment, a vacuum cleaner, large platters and framed collections because these often expose an undersized compartment. For repeat categories, count a representative section and estimate future growth. Record whether the item is heavy, fragile, private or used by a child or older person. The result should be a concise schedule with categories, quantities, largest dimensions and preferred access, supported by photographs only where they clarify a real constraint.

        Decide what should be visible, concealed or flexible

        Display is not the same as storage. Open shelves invite curation and regular dusting; closed doors calm the room but can hide forgotten possessions. Drawers make contents visible from above, while deep shelves often create a second inaccessible row. A mixed approach is usually more resilient. Define the few categories that deserve display, the practical items that should disappear, and the elements that may change. Adjustable shelves, removable dividers and freestanding cabinets can absorb change more easily than highly specialised compartments. The Design Council’s inclusive-design principles support considering different users and circumstances rather than treating one idealised user as the default. Apply that thinking to reach, grip, visibility and shared access without assuming identical needs throughout the household.

            Coordinate services and maintenance early

            Storage can conflict with air grilles, electrical panels, controls, curtains, skirting, access hatches and cleaning routes. Charging drawers, illuminated display shelves and powered wardrobe accessories introduce cables, ventilation and replaceable components. The brief should flag these ambitions before elevations are fixed, then the appropriate specialists can confirm requirements. Also record how shelves, runners and filters are cleaned or replaced. A full-height door may look simple yet require enough clearance at the ceiling and floor; a concealed panel may become impractical if it blocks maintenance. Keep service access identifiable in the drawing set and avoid treating a seamless elevation as permission to bury equipment.

              Planning example: the formal dining wall

              Imagine a notional villa with a 3.6-metre dining-room wall. The first request is for symmetrical glass display cabinets and a central artwork. The inventory reveals twelve everyday place settings, occasional service for twenty-four, three tall appliances used for entertaining, bulky table linen and a growing ceramics collection. The revised brief keeps a restrained display zone but gives everyday tableware shallow drawers near the dining table, tall ventilated capacity for appliances and adjustable concealed shelves for serving pieces. The artwork retains a clear field and the heavier objects stay at a manageable height. This Planning example is fictional; it shows how inventory evidence can preserve the visual idea while changing the internal allocation.

                  Joinery-design checklist

                  Review the inventory and the proposed joinery together before approving detailed drawings or finishes. Ask the designer to show internal elevations as well as the closed façade, because the interior determines whether the brief is actually met.

                  • Room, routine and user identified for every storage group
                  • Daily, occasional and archive items separated
                  • Outsize and heavy items measured
                  • Capacity includes an agreed growth allowance
                  • Display, concealment and security choices recorded
                  • Reach, visibility and shared access reviewed
                  • Internal accessories selected or given a firm decision deadline
                  • Power, lighting, ventilation and service access coordinated
                  • Door swings, circulation and delivery route tested
                  • Adjustability and future reuse considered

                    Limitations and the right next step

                    An inventory cannot replace a measured survey, structural review, product data or detailed joinery drawings. It also cannot predict every future possession, so over-specialisation remains a risk. Moisture, heat, fire safety and electrical conditions need project-specific professional input where relevant. The next step is to run a storage workshop using a simple room-by-room schedule, then issue marked plans and elevations showing capacity zones rather than finishes alone. Ask for one representative internal elevation and a sample drawer or shelf arrangement before repeating the system across the home. After occupation, review what is consistently left outside cupboards; that feedback is often the clearest measure of whether storage supports real life.

                        Sources & further reading

                        Make this useful for your project.

                        A review of your property and priorities can turn general guidance into a defined brief.

                        Explore Villa interior designDiscuss your project
                        Return to the journal