The direct answer
A wardrobe brief should translate a measured inventory into named storage zones, then coordinate those zones with door movement, hinges, drawer travel, lighting and the actual room. It should state what hangs long or short, what folds, how many shoes and bags need space, which items are used daily, and what can sit high. Before fabrication, the user should be able to review an internal elevation with clear dimensions, hardware references and access zones. A beautiful exterior is not a substitute for this operational drawing.
Begin with an inventory, then add growth
Count real categories rather than writing 'general storage'. Measure a representative long garment, jacket, shirt stack, shoe box, handbag and suitcase. Separate current everyday items from seasonal or occasional ones. The whole-home storage inventory guide helps determine what belongs in each room; the wardrobe brief goes deeper by assigning that volume to rails, shelves, drawers and trays. Add a modest, explicit growth allowance where it matters instead of leaving an undefined empty bay. The result is a testable schedule: for example, one long-hang zone, two short-hang zones, six pairs of tall shoes and two shallow accessory drawers.
Use three access bands
Organise the elevation into daily, occasional and archive bands. Daily clothing belongs within comfortable view and reach. Less frequent bags or folded items can sit above, while heavy cases should not be placed where retrieving them is unsafe. If a high rail is proposed, select the exact lift mechanism early and review its operating arc, rated load, handle reach and clear space using current manufacturer data. Hettich's wardrobe-interior catalogue, for example, shows that rails, pull-outs and accessory fittings are distinct components with specific configurations. Do not design a generic symbol and select the hardware after the carcass is made.
- Daily band for frequently worn clothes and accessories
- Occasional band for seasonal items and less-used bags
- Low stable zone for shoes or heavier items
- High zone only for light items or a reviewed access mechanism
Resolve doors, hinges and moving parts together
Every moving component competes for space. A hinge can block an internal drawer; a sliding-door overlap can hide the centre of a bay; a deep handle can meet a bedside table; and a pull-out tray needs clear standing room. IKEA's current PAX planning guidance is product-specific, but it usefully demonstrates the principle: ceiling clearance differs for hinged and sliding-door assemblies, and hinge positions affect where drawers can sit. For custom joinery, the fabricator should provide the exact hinge, runner and door data, then show opening arcs and conflicts on the shop drawings. Review both the cabinet interior and the room around it.
Choose fittings by function, not quantity
A trouser pull-out, jewellery tray, hamper or shoe rack earns its place only if it serves a named category and remains accessible. Special fittings reduce the net storage volume and may require more maintenance than a simple shelf. Compare each option on capacity, visibility, ergonomic reach, cleaning, replacement availability and how it affects adjacent zones. Keep frequently changed categories on adjustable shelves where possible. Record removable dividers and spare shelf positions so the wardrobe can adapt without a new carcass.
- Named item category and expected quantity
- Usable internal dimensions after hardware
- Clear operating space and user reach
- Cleaning and replacement access
- Adjustment range for future change
Coordinate light, power and ventilation carefully
Integrated light can make dark finishes and deep shelves easier to use, but it needs more than an LED strip on an image. Define the colour quality, glare control, switch or sensor behaviour, driver location and how parts are replaced. Keep the driver accessible and coordinate any mains work with the qualified electrical designer and installer. Consider airflow around damp or recently worn clothing and avoid treating decorative perforations as a guaranteed ventilation solution. The appropriate approach depends on the room environment, cabinet construction and building services; it should be resolved rather than assumed.
Planning example
A fictional couple has a 3,200 mm wall for a shared wardrobe. One person owns 18 long garments and many shoes; the other mostly has shirts, jackets and folded knitwear. An equal split would waste short-hang height on one side and leave no tall shoe space. The revised brief assigns one full-height hanging bay, two double-hang bays, adjustable shoe shelves, four shallow drawers and a shared high suitcase shelf. The shop drawing moves the internal drawers away from door hinges and leaves an accessible lighting-driver compartment. This is a planning method, not a universal module size; final dimensions follow the measured inventory, selected hardware and room survey.
Pre-fabrication checklist
Review the drawing at full elevation and check the following before approving materials or cutting panels.
- Room dimensions, skirting, ceiling, outlets and obstructions are surveyed
- Inventory categories and growth allowance are recorded
- Long hang, short hang, folded items, shoes and accessories have named zones
- Door, hinge, drawer and pull-out conflicts are cleared
- Exact hardware, rated use and finish references are scheduled
- Lighting, sensors, cable routes and driver access are coordinated
- Ventilation and cleaning access are considered
- Delivery, assembly and final installation sequence are confirmed
Limitations and next step
Generic ergonomic diagrams and retail-system dimensions are useful prompts, not substitutes for the selected hardware data or a measured site. The fabricator remains responsible for detailed shop drawings and suitable construction; qualified specialists must design electrical work and any wall fixing that affects safety. Ask for an internal elevation, a door-open plan and a hardware schedule, then mark each stored category on the drawing during a review. Once the user, designer and fabricator agree the same annotated version, the exterior finish can be approved with much less risk of a wardrobe that looks composed but works poorly.